500kw suppliers and gas pressure hot water boiler offer
Details of 25 ton oil steam boiler
SZS oil fired steam boiler applies D layout, longitudinal arrangements are installed for upper and lower drums. Membrane wall pipe are at the both side of wall of right hearth, super-heater is located at the turn of furnace outlet, and economizer is installed at the tail. With pressure-fired combustion, high combustion efficiency, lower funnel temperature and high efficiency, only air blower equipped with, little power consumption, and lower running expenses. With large hearth, full combustion, and wide adaptability of fuel. Our SZS series oil and gas boilers offer innovative design maximizing efficiency. These Water Tube boilers incorporate a furnace with a large surface area to maximize thermal heat transfer. The boilers are designed and manufactured to an accepted standard in ASME under an ISO9000 quality management system. In addition, third party inspection, by a Department of Labor approved body, is also carried out to independently verify quality during the manufacturing process.
Small oil-fired boiler flameout protection device use: small oil-fired boiler furnace space Product Introduction small oil-fired boiler of large and adaptable load capacity. Rational design of steam separator apparatus built to meet user requirements need to use higher quality steam. Furnace open manhole, head holes, hand holes, to facilitate the internal furnace to clean up, make repairs, maintenance is very convenient. Boiler safety interlock with multi-level protection: protection pressure switch (higher than the set auto stop and pressure), the low water level protection (boiler water level is below the warning level in the body, and automatically cut off power alarm), the protection valve (boiler pressure exceeds the pressure of work, discouraged automatic blood pressure), ensure that the boiler in a variety of conditions foolproof, secure home. Mechatronics combined organic appearance, new sophisticated, compact, less space, easy to transport and install. Thermal insulation materials and the use of new high-quality white color plate package, lighter in weight, good insulation properties, beautiful, not rust. Use flameout protection device for small oil-fired boiler to prevent furnace explosion, the fuel (gas) boiler must be set flameout protection means functions combustion in the monitoring of the furnace (including an ignition when the ignition failure or combustion halfway off, typically 5 seconds the re-ignition, run 1 second, off into the oil (gas) solenoid valve, and turns on and audible alarm signal, when the blower continues to operate, the residual gas was purged of combustible furnace, after 20 to 30 seconds after purging, and various auxiliary blowers automatically cut off power, the boiler stop running.) by the flame monitoring and control device component. Role is to monitor the flame control device signals the presence of a flame or interrupted. The main use of the photomultiplier tube, a photovoltaic cell and photosensitive resistance, they have an infrared type or ultraviolet type, A photoelectric conversion element, the working principle of the light converted to the corresponding strength of the radiation intensity of current. And a linear output state, sometimes weak induction current, through amplification, in order to have an effect on the controller.
The main problems of autonomous decentralized boiler heating mode: 1, "two small" boiler room that is small-scale (10,000 m- for the following boilers 60%), small boiler capacity (single boiler average capacity of only 2 tons / hour). "Two low", i.e. the boiler load is low, the thermal efficiency is low. Calculated heat index 70W / m =, 0.7KW (i.e. 1t / n) for 10000m =, in fact, only for 4000m =, less than half, in the "Mara car" low load operation. Thermal efficiency is naturally low, generally only reach 50-60% oC "two can" That is more than the energy consumption, the existing multi-intermittent heating (burning six hours every day and night, stopping six hours, repeated twice). In the current institutional heating intermittent heating accounted for 82%, only 18% of continuous heating. 2, boiler room hire older workers and the burning of a modern boiler during operation merely by virtue of the experience "the sky light a fire," there is no scientific basis for heating, that is, how many points you cold, warm day less burning point, which is very difficult to achieve the purpose of heating and energy requirements. 3, the heating system is unreasonable, due to some historical reasons causing heating in the system has inherent missing, and in the intermittent heating is due to habits die hard so the resulting decline in the quality of heating also a waste of energy. 4, which is related to the owners and the quality of that set out secretly put a hot water tank, can lead to heat loss, water loss occurs, really makes the heating unit is really a headache, which cause heating problems. 5, since the local heating technology of high and low level, so that in the heating process, the heating requirements for the simple pursuit of the distal end of the owner excessively coal temperature of the heating water, resulting in overheating proximal end, a distal end of the warm unbalance, or warm proximal distal cold conditions, which resulted in a waste of energy, will not help solve the problem. 6, the boiler disrepair, will take place at the junction of the pipeline corrosion, fouling and even the phenomenon is really due to the HVAC heating during water treatment errors caused by, resulting in fouling of the boiler heating surface, or Since the agent is such that the boiler ash surface to form grime, which is management problems. 7, the high heat load design makes enormous waste in financial resources, but also makes the device parameter selection is also too large, the most important thing is a waste of energy. 8, due to improper selection of the boiler supply pump, such that the heat medium low boiler room parameters, the performance of the boiler is low lift, low thermal conductivity, insufficient heating vicious circle. 9, due to the design of overkill situation arise, ie, a single heating boiler can solve the problem, but using a more common heating boiler, resulting in low thermal efficiency of large coal consumption and generate unreasonable conditions. 10 vertical imbalance, if indoor heating system will be conducive to eliminating the balance of water resistance, which requires the designer to identify line) inputs the number of circulating pump is too large, such a large pump flow, low return temperatures, generally in 25 degree. This will increase electricity consumption. 11, about the nature of different heating buildings, commercial buildings and residential buildings if the use of a heating system is the same, then since the days of the commercial building heating requirements of large, large civil construction heating at night, if you can not time-heating, is bound to cause waste of energy. 12, single-tube heating system installed can not be achieved thermostatic valve on the radiator, but now a lot of indoor heating systems or belong to single-tube system, which is not conducive to long-term development. 161, why gas hot water heating boiler heating problems occur each year to slow the heating time, a gas boiler heating the user of the problem in many areas of heating will slow, but the problem is often not the fault based on the boiler itself. In this regard, today we elaborate on the reasons for this phenomenon. 1, because the use of gas-fired boiler heating, after carrying out the heating boiler ignition, but also need to go through the oven, cool-running, heat exchangers and other process, so as to make heating gradually warming. After the gas 500kw suppliers and pressure hot water boiler offer heating during ignition, the oven is ready to work early each year heating must be carried out, a process that takes about 3-5 days to complete. 2, the use of the process, gas hot water boiler also need to go through the process of heat transfer, the temperature will gradually rise. Gas heating boiler heat exchange process is mainly water cycle process, stand out from the hot water not flow directly to the residents of the home heating network, but need heat exchanger unit to transfer heat energy in the hot water heating plant to the residents of the home in the circulating pipe network. 3, starting at the initial stage of the heating boiler, water temperatures of the respective heating stations is not very high, coupled with the complex structure of the network, the gas hot water boiler heating hot water heat exchanger is a process, especially in the end of the pipe network user, heat transfer process will be a little longer time.
In early 2013, fast boiler is a food processing company Luohe a 10-ton condensing steam boiler installed integrally cloud service monitoring module, by monitoring the data found in March, the maximum pressure in the boiler set small deviation, the small boiler load adjustment range, and it uses a continuous replenishment way. When such a large load changes, the burner will start and stop frequently, adversely affect the boiler. After the burner system to monitor working properly, timely communication with customers, to help customers put pressure adjusted to the maximum deviation of the normal range. Then return to the display data safe range, the maximum starting frequency is reduced to the burner 4 times / hour from 8 times / hour, reduced by the mean starting frequency of 3.7 times / hr 1 / hr reported in June. At the same time gas consumption decreased by 10% to obtain the customer's trust and recognition.