bagasse fired water boiler for laundry
Reheater is essentially a low-pressure steam has done work again heated and reaches a certain temperature steam superheater, reheater effect of further improving the thermal efficiency of the cycle plant, the steam temperature control and last stage steam turbine blades within the allowable range. The steam superheater from the steam turbine in the boiler is heated up to a superheated steam heater. The main effect of heat and then there are two, one is to reduce the humidity of water vapor, help to protect the turbine blade; the second is restrained to increase the relative rate and absolute turbine internal efficiency. Heated again by the high pressure exhaust cylinder is returned to the boiler steam turbine, and then to the low pressure cylinder expansion work. Purpose is to make the steam turbine last stage blades and humidity controlled within the allowable range. Reheat steam pressure of 20% superheated steam pressure. More than 125MW Unit in China have adopted the single reheat system.
In 2019, the union group will embark on a new journey: a training mechanism to deepen the development of the division with only workers; 2 integrated use of union propaganda platform; 3 to create innovative model worker Studio; this will be the union in 2019 to everyone... bring a new experience. Let's get 2019 new leaps and bounds under the guidance of the company "professional life, work lean" core values.
Notes Henan boiler installation of what? Henan thermal power plant boiler manufacturing operations is a very important process of production equipment, has a very close relationship with the thermal power plant can secure stable operation. As a first step Henan boiler installation boiler is in operation is critical step in the boiler installation quality will directly affect the safety of boiler operation, this article analyzed for thermal power plant boiler installation and precautions Henan. 1, note that detect various parts of Henan deal with boiler installation of the steel frame before lifting steel safety lifting work, but also need to check the various parts, to ensure that each object does not have any damage. In the process of installing steel drums, the need to check the back cover and the second details are complete, you need to pay special attention to ventilation, to ensure the Henan boiler installation complies with the requirements. 2, any pilot flow conduit valve body Henan boiler testing operations complete test run after installation, which is to detect and correct the problem, to prevent problems during actual operation. Only tested performance and product quality to be able to guarantee safety before presenting better results after the industry-leading Henan boiler installation. 3, pay attention to the effect of soldering and welding safety and reliability not only need to add a provision on the basis of auxiliary materials, and the problem on the basis of the welding work welding standards that appear in the timely adjustment of operation. A very important position trustworthy Henan boiler, normal production and operation is an important guarantee power plants, by analyzing a particular boiler installation process and the process can better improve the boiler installation techniques to ensure high quality and boiler installation work construction is completed late power plant efficiency has very important significance. The above is the major considerations boiler installation of Henan, Henan and boiler operation safety and reliability with its own faults and operation are closely related, and installation quality is good or bad is also directly related to the safe operation of the boiler in Henan, so consumers need to grasp good boiler installation process, boiler installation of strict quality control to ensure the efficient and economical operation of the boiler can, to be able to adapt to the thermal power plant boiler Henan ensure normal operation, stable supply of electricity is required particularly careful when installing the relevant details .
Yesterday, our sales email received an letter from America. He wanted to buy a set of 5 ton gas fired steam boiler for his Mushroom drying room. People who are not familiar with mushroom industry would not know that it also needs our industrial boilers indeed. Here, I tell you that during mushroom drying and degassing process, it urgently needs steam to work. So, this is why an mushroom drying room needs our industrial steam boiler. ZG Boiler manufactured 5 ton gas fired steam boiler has ASME and IBR Certifications which can meets both domestic and overseas consumer demands. Here, the writer just talk more about our WNS natural gas fired steam boiler.