commercial 11ton condensing gas boilers
In Nigeria the economic cost of producing this magnitude of electricity by methane gas is estimated at about $2,000/hr.On the other hand it cost virtually nothing or little amount to procure EFB which is seen as a waste by small scale oil Plantation Companies, the only cost incurred probably comes from transportation of the material, thus making the use of EFB very economical as an alternative fuel for firing a CFB commercial 11ton condensing boilers plant.
2. Energy-saving horizontal diesel commercial 11ton condensing boilers
The oil and gas boiler produced by ZG boiler uses a large volume design of the combustion chamber to make combustion more fully and save fuel.
Meanwhile, at the annual meeting of the excellent performance of employees also distributed millet television and different incentives such as bonuses, is intended to encourage employees to continue their efforts to create more success in 2019. In the meeting, the president has placed us deep hopes in 2019 to focus the project, focus on value, cohesion output! Let the wind and waves, temper forward to the next five-year development strategy for the company's work starting point, in order to achieve the objectives as an important breakthrough, and jointly create a more brilliant 2019!
How to set the height of the commercial 11ton condensing boilers chimney
The coal fired boiler can be divided into two kinds:vertical boiler and horizontal boiler. And the horizontal boiler is very economic because of its long flue gas flow, slow smoke discharge, high heating efficiency. So it is widely sued in the market. After buying a boiler, it is necessary for them to build a boiler room,in the installation the height of the chimney also need to pay attention. According to the ZG engineer, the chimney height should be accordance with the lowest height of GB13271-2001 stipulation. Only one chimney is allowed in a boiler room. The specific requirements was listed below:
1.When the boiler’s output capacity is more than 1t/h or 0.7MW, a permanent thief hatch and relevant facilities should be setted in compliance with the stipulations of measuring method for smoke and dust of boiler emission, and The determination of particulates and sampling methods of gaseous pollutants emitted from exhaust gas of stationary source.
2. The exit diameter of the chimney should be not lower than the largest load. The smoke flow should not be too fast. when the load of the coal fired boiler is at its lowest level, the velocity of the chimney exit should not lower than 2.5~3m/s.
3. If the chimney heat does not reach the height of the above stipulations, the maximum discharge concentration of the dust,sulfur dioxide, nitric dioxide should be carried out at 50% of the corresponding area and time emissions standard .