cylindrical fire tube boiler 1001 kg capacity or less
For our mining and use of natural gas is still in the development stage, gas prices are still floating in. Many want to use natural gas cylindrical fire tube boiler 1001 kg capacity or less users and potential users are very concerned about the problem of consumption of gas boilers, gas boilers of how to reduce gas consumption has become the best way for people to seek to reduce the cost of the boiler. So, how to do to achieve this aim?
Waste heat recovery of cylindrical fire tube boiler 1001 kg capacity or lesss
The flue gas temperature of the boiler generally ranges from 120 ℃ to 350 ℃. 7% of the sensible heat and 15% of the latent heat in the flue gas are discharged directly into the atmosphere without being utilized. This not only causes a large amount of energy waste, but also aggravates the thermal pollution of the environment. On the one hand, the high-efficiency flue gas waste heat recovery device designed by us can not only meet the need of processing hot water or heating water, but also can cool the exhaust temperature of boiler to 100 degrees, so that the efficiency of boiler can be greatly improved. On the other hand, also for the national blue sky and white clouds environmental protection cause has made the due contribution.
Since this year, Qingyang City, Gansu Province Environmental Protection Bureau to continue to improve air quality at the core, in order to implement the Air Pollution Control Act as the main line, adhere to the rule by the people, source control, increase the comprehensive management of air pollution, construction of accurate and efficient and fine air pollution comprehensive prevention and control system, to fight air pollution control tough fight.
Qingyang Xifeng Kowloon City Road, South Street neighborhood community coal-fired boilers in accordance with the "clear" work requirements, continue to increase coal-fired boilers "cleared" efforts, multi-pronged, comprehensive treatment of the families of Xifeng Animal Husbandry Bureau building coal-fired boilers were removed.
Since coal-fired boilers to carry out "clear" its work, Kowloon South attaches great importance to the community, seven coal-fired boilers within the jurisdiction of actively deployed, timely follow-up, held a special arrangement will, continue to strengthen measures. In the community workers and urged many times to persuade, the District Animal Husbandry Bureau family member courtyard boiler successfully removed. After removal of this coal-fired boilers, coal-fired boiler demolition community task has been completed.
Phase out coal-fired boilers is an important measure to improve the air quality of the environment, but also the strong expectations of the masses. The demolition action, and effectively promote the area to carry out "the image of the city, the level of management" to work for the creation of a national civilized city to make its due contribution.
Hot water cylindrical fire tube boiler 1001 kg capacity or less smoke pipe severe corrosion damage analysis during hot water boiler running, replace the boiler pressure parts and scrapped due to severe corrosion problems caused also often occur, then this situation should be how to deal with it? the reason hot water boiler smoke pipe serious corrosion damage to: (1) boiler water does not go through water treatment, water is not compliance, coupled with improper cleanup, debris attached to the pipe wall, scaling and corrosion phenomena. (2) around the smoke tube because the water flow rate is too low, can not be precipitated by heating water circulating oxygen bubbles discharged from the furnace with timely inevitably adhered to the metal wall of the smoke tube, so that the increase in dissolved oxygen around the metal wall and the metal wall in the end and can continue to create favorable conditions play a role. Remedy: 1. strengthen management in accordance with the provisions of heating systems, to maximize the construction of water leakage, ensure safe and economic operation of the boiler. 2. boiler water should strictly comply with state standards for water softening treatment, before use standards. 3. Design hot water boiler should try to choose the appropriate flow rate for each cycle of the furnace. In short, for hot water boiler smoke pipe serious corrosion damage to the phenomenon, to be timely normative operation process, and can not be sloppy, process boilers used simultaneously performed, with particular attention to these points, standardize operations, precautionary measures in the first place.