gas boiler for sale pool patio and bbq
Coal-fired boiler for sale pool patio and bbq gas conversion costs budget analysis
Under pressure "atmosphere 10" The premise of the policy and the current environmental situation of coal to gas expansion work is now in full swing up. So the transformation of the capital budget for gas fired boiler is how to conduct it? This is basically the transformation of the former coal-fired boilers for each client during prepared to do the necessary work. And today we talk about making a few parties need to pay attention when gas fired boiler reconstruction budget
Diqing in Yunnan Nonferrous Metals Co., Ltd. mainly engaged in Pulang copper mining, site selection, sales and other items. As we all know, in the copper smelting process, it consumes a lot of electricity and thermal power resources, which account for most of the hot water consumption. Combined with the actual demand Diqing company, to provide fast Boiler 1 stage electric heating hot water boiler for sale pool patio and bbq of 2.1MW.
Four coal-fired boiler for sale pool patio and bbqs precautions to meet a variety of fossil fuels and natural gas sectors of production, often require boiler, the general common is to transform into a coal-fired furnace gas-fired boiler, to change the high fuel costs of coal on the environment cause serious pollution problems, specific issues unique boiler is not a small project, you need to pay attention to a good close links with each transformation in order to avoid failure of transformation, on boiler should be noted that we have to understand the following description. 1, the original boiler demolition work; boiler before carrying out the original host and auxiliary boilers need to be demolished, concrete demolition work carried out by professional staff, in order to more quickly complete the demolition work with but also to prevent the demolition process in the event of any accident; 2, note that pressure capacity of the boiler; small boiler into the gas by the coal-fired, also changed the original negative and positive pressure combustion burner, the process you need to pay special attention throughout the furnace wall the structure and sealing, the sealing function, it might cause the boiler after the transformation could not withstand the pressure and accidents; 3, furnace renovation precautions; when in many cases will change the gas burner, because the fuel mist of poor or incomplete combustion of the fuel gas remaining in the furnace a little mistake will cause fire or explosion, it is carried out after completion of the transformation for an explosion vent installed in an appropriate position to prevent the explosion, while additional ignition flame protection means after the boiler guarantee safe operation; 4, after the transformation of the test; after the completion of high-quality boiler transformation, but also the need for reuse Sophisticated testing to confirm their safety, commonly used test method is boiler pressure after the transformation of high-pressure test, and finally pass a test meet the standard may be considered completed after the entire transformation boilers. Caution visible through major transformation over the course of gas boilers, boiler reconstruction requires not only technical but also need to meet the relevant standards in order to ensure more successful boiler and can be smoothly carried out using, of course, in the transformation of the former users need to analyze the structure of the entire boiler study, confirming boiler renovation project can be re-introduced in order to avoid unnecessary waste.
Gas-fired steam boiler for sale pool patio and bbq safety valve from installation to use, it must remain vigilant safety valve is one of the most important components of the gas steam boilers, boiler probability of the risk occurring due to various incidents can effectively suppressed. This article focuses on the safety valve from installation to use several important considerations, we do not ignore the use of gas when it steam boiler. A Notes 1 safety valve, the safety valve should be mounted vertically in a high position in the pot business, set box. 2, between the safety valve and the drum or header, not equipped with access to the steam outlet pipe and the valve. 3, the lever-type safety valve should prevent movement of the self-apparatus and the weight limit leverage deviant guide tube, a spring safety valve should lift and handle means for preventing movement of the adjustment screw is screwed lightly. 4, the rated steam pressure less than or equal to 3.82MPa gas steam boiler safety valve throat diameter of not less than 25mm; power greater than the rated steam pressure 3.82MPa boiler safety valve throat diameter not less than 20mm. 5, the safety valve and coal-fired steam boiler tubes, the cross-sectional area not less than the cross-sectional area of the valve inlet. If several valves installed together with a short tube directly connected to the drum, the cross-sectional area of the passage should not step short tube to 1.25 times the area of all the exhaust valve. 6, the safety valve should normally be installed exhaust pipe, exhaust pipe should be through a safe place, and there is sufficient cross-sectional area to ensure the smooth flow of exhaust. 7, the safety valve exhaust pipe at the bottom should have received a place of safety posturing of drainage pipe, the exhaust pipe and drainage pipe not allow the installation of the valve. 8, rated evaporation to 0.5t h coal-fired steam boiler /, at least two safety valves installed; Rated evaporation 0.5t h less than or equal to electric boiler /, mounted on at least a safety valve. 9, separable economizer outlet, the steam superheater outlet valve must be installed.