good choose 9kw wet steam generator for home use
Subsequently, the Secretary-General Wang Jiao Ling line with the company's quality control staff had a discussion on the case of the reform of administrative licensing review of the existing boiler model in the country, how to promote the development of high quality assessment boiler, with the assessment of how businesses, trade associations and work promoting industry innovation and innovation to lead the development of what the expectations and demands, boiler regulations and technical specifications and implementation issues recommendations related issues exist in the process conducted in-depth exchanges and discussions, and Lu, president of the company's quality management staff made a lot of valuable Suggest. Wang Jiao Ling Secretary-General spoke highly of the technical aspects of the advantages of fast Boiler green energy and green development, and other fast-outstanding contributions boiler industry group to promote environmental protection and efficient process affirmed.
Secondly, if your boiler is electric steam boilers, the installation should pay attention to the ground as it relates to the use of safety later. In order to secure the ground wire installation, a ground line nearby and piling a depth greater than or equal to 1 m 5, the cable connector ground should be sintered at a ground pile head. Moisture to prevent rust should be higher than the ground connecting linker 100mm is appropriate. Boiler exhaust chimney to be discharged toward the outside should be, and should be higher than at the outlet of the boiler Di from 1.5 to 2 m. Ask your local branch overhaul of special equipment installed after the declaration. Acceptance by the relevant part of the consent to the use, and receive a use permit before using the boiler. 30L or less than the vapor pressure of the good choose 9kw wet steam generator for home use volume is less than 0.1MPa fall within the scope of the national exemption, ie no need for boiler use permits can be used.
Electric steam boiler electric steam boiler Notes Notes 1. Follow all warnings and instructions on the machine brands. 2. In order to prevent a negative pressure in the boiler, after sewage, before the next boiler operation, please do not close the drain valve. 3. In order to ensure the normal operation of the good choose 9kw wet steam generator for home use and security, should always observe the operation of the boiler pressure boiler, heating the water level and the situation is normal. When the steam generator failure, should immediately stop check, troubleshooting before the restart. 4. When the boiler stops longer running time, cut off the power while the boiler, the water inside the pipe exhausted to prevent frost damage, rusting. The machine usually is not used, power off, the control box is opened, check all the electrical device terminals fasteners, looseness should be sturdy, to prevent bad burning ignition wires have electrical device. 6. The electronic control box may not be water or steam and flammable gas, electric cabinet must shut the door in the boiler running. Never electrical control member any liquid or water flowing into the system, such as motors, electric control box. Cause gas boiler burner ignition misfire rod causes gas boiler burner ignition misfire bar: 1, the ignition bar gap interposed carbon residue with oil. 2, ignition rods fragmentation. moist. Leakage. 3, the distance between the ignition does not stick, too long or short. 4, ignition rods Insulation damage, short to ground. 5, ignition cable and transformer failure: cable, connector damage caused by a short circuit during ignition; transformer break or other fault occurs. Gas Burner fails, the action bar ignition misfire following five: Clear, renewal, adjust the distance, change and switching transformer.
Boiler maintenance programs Here are some boiler maintenance program: 1, when cleaning the generator, first off the power until completely cooled generator is sweeping .2, once a month to clean the tank to remove dirt and water .3, clear first Turn off oil feed switch, 2-3 times per month .4 clean oil filter, wash the furnace once a year, to remove scale .5 interior pipe wall, frequently wipe generators and burners, fuel tanks and other clean .6 after cleaning if more start, please be dried before being launched. our company has consistently adhered to abide by the contract, thoughtful after-sales business purposes, I will continue to provide better services to you, welcome to visit our factory, and hope to continue to get all the new and old customer support.