high thermal efficiency mini electric steam boiler
Gas hot water boiler gas hot water boiler water quality standards and parameters of different capacities, in accordance with various operating conditions, the level of water treatment technologies and different long run, have different quality standard requirements. For details, see table below: This table is our current national standard "industrial boiler water quality" performance standards (GB1576-2008) mentioned. 1, the outlet for the rated steam pressure <2.5MPa, water as a medium, and a fixed soft drinks dual boiler hot water boiler, general use outside the boiler water treatment chemical, boiler water and feed water quality should meet the requirements of the table. 2, the rated evaporation <2t / h, and the rated steam pressure <1.0MPa gas hot water boiler of the boiler may also be employed and soft drinks dual dosing process in the boiler, the boiler must structure, corrosion and quality strengthen oversight, good dosing, sewage and cleaning, water quality should meet the requirements of the table. 3, pressure hot water boiler feed water for boiler water treatment should be carried out. 4, for hot water boilers and pressure hot water boiler rated power ≤4.2MW, you can also do the dosing process inside the boiler. 5, Feedwater should be outside the boiler water treatment chemical. 6, waste heat boiler water quality indicators and electric water boiler should be consistent with the type of required parameters with the boiler
For the 2018-2019 autumn-winter air pollution prevention and control work, Jinhua City, Zhejiang Province issued a public draft, mainly in the autumn and winter to reduce heavy pollution weather Development frequency.
Take measures to reduce coal comprehensive, non-electric focused on reducing the total coal consumption, in 2018 the city's total coal consumption reduction of 1% compared with 2015. New non-owned coal-fired units, the implementation of new large-scale coal-fired units and coal consumption of the same amount of capacity reduction or substitution, elimination of energy consumption, water consumption, environmental protection and safety is not up to 300,000 kilowatts coal-fired units. Development of industrial parks "One District One heat source" action plan, and more than 300,000 kilowatts coal-fired units were heating transformation, promote backward and shutting down small coal-fired thermoelectric integration of coal-fired boilers in the range of 15 km radius of the heat. Optimize the use of natural gas structure, in principle, to new natural gas cogeneration and gas chemical projects, to the new "coal to gas" projects, should adhere to increase coal gas reduction synchronized to gas will change, the premise of the gas supply contract signed and orderly implementation.
Coal-fired boiler (with tea furnace, operating a stove, grain storage and drying equipment, coal-fired facilities) carried out an intensive investigation to ensure that no dead ends, no blind spot. Investigation and the coal-fired boilers to register one by one.
According to the law to increase the city's efforts to phase out coal-fired boilers in accordance with regulations. Before the end of December 2018, the city basically out of 10 tons of steam per hour of coal-fired boiler, built-up areas out of 35 tons of steam per hour coal-fired boilers. Complete 1 set (Yiwu) per hour, 40 tons of steam coal-fired boilers transformation of ultra-low emissions, coal-fired plants to achieve ultra-low emission levels.
In principle, the boiler NOx emission is not higher than 50 mg / m, and comply with appropriate safety boiler specification. New installation and reconstruction of gas-fired simultaneously supporting the low NOx combustion device.
Biomass boilers to carry out a comprehensive investigation, complete control of boiler scale, distribution, fuel, furnace, pollution control facilities and pollutant emissions, and establish a list of management accounting. Yan Gesheng biomass boiler registration, strictly control the new urban area of biomass boilers. Biomass boilers should be dedicated boiler, coal and other prohibited blended with other fuels, efficient dust bags and other ancillary facilities. Actively promote the urban area of biomass boilers ultra-low emissions transformation. For existing biomass boilers, environmental inspection carried out one by one, there are multiple distributed biomass boilers, the implementation of the demolition of small and large industrial agglomeration area.
Industrial high thermal efficiency mini electric steam boilers, electric, industrial steam boilers offer much quote how much? Although natural gas steam boiler is mainstream, but as many local companies still need electricity steam boiler. So, in industrial production, there are still many places need to use electric steam boilers that do not have a specific price of industrial enterprises to fast boiler consulting industrial electricity steam boiler. In this regard, the pre-sales engineer fast boiler after a detailed understanding of the needs of the industrial enterprises to provide current data capacity, there is the production of steam required tonnage, so, to be able to be used for the enterprise the tonnage of the most accurate accounting, for which data fast boiler pre-sales engineer is given the industrial enterprises 2t electric steam boiler on it. The current price of the fast boiler models at around 180,000.
Electric power operation a steam boiler steam boiler flame condition is a kind of power for energy conversion from electric energy into thermal energy, the hot water or organic heat medium (HTF) is heated to a certain parameters (temperature of the boiler through the heat exchanger portion, pressure) and externally output has a nominal thermal Machinery working fluid. The use according to electric boiler can be divided into: KS-D electric water boilers, CLDR (CWDR) electric boiler (including an electrical heating bath boilers and electric boilers), LDR (WDR) high thermal efficiency mini electric steam boiler. Electric steam boiler in the process of running, fireman personnel to observe the combustion flame, burning flame can burn if fully reflect fully, a number of other accessories such as whether there is a problem, then the fireman can be carried out according to the boiler combustion flame swap, in order to reach the normal combustion. If the flame exhibits electric steam boiler combustion yellow-orange, with neither white nor black smoke bright and clear outline, surrounded by non-sparking, fire smoke color other than transparent; size and shape of the flame at high fire to substantially fill the chamber but the phenomenon of flame swept and peripheral heating surface does not appear. In the case where the oil temperature, oil pressure requirements are met, such as the Mars entrained in the flame, it is possible that nozzle clogging. When the atomization uniform, the local flux density is too large, the presence of coarse particles or droplets, can see the flame root few black stripe, snow flake peripheral flame Mars large droplets combustion. If there is incomplete combustion of carbon black and outer combustible gas flame, the flame and smoke in rewinding the tail and around the flame, smoke opacity. Here the air volume should be adjusted, with the wind flame-inspection position of the disc, to remove the nozzle may hit coke.