home use thermostat hot water boiler factory
The normal shutdown operation of the home use thermostat hot water boiler factory is to stop the supply of fuel, stop the supply of air, and then stop the induced air, but it is not allowed to stop the circulating water pump when the boiler outlet temperature is lower than 50 °C.
Zhejiang Yiwu issued the "Yiwu winning Blue Sky Battle 2019--2020 action plan." Plan to improve air quality, enhance people's happiness index target put forward concrete measures of implementation, as follows.
1, vigorously develop clean energy. In-depth implementation of the "creation of a national clean energy demonstration Zhejiang Province Action Plan (2018-2020 years)" "Zhejiang three-year action plan for natural gas development (2018-2020 years)" and "Jinhua" Thirteen Five "Renewable Energy Development planning". According to "gas of the gas should be '' should the electric power" principle, energy companies actively guide clean energy alternative embodiment, in 2020, the proportion of the power in the final energy consumption of clean energy consumption accounting for the higher level, the city gas consumption amounted to 150 million cubic meters.
2, control total coal consumption. Strengthen energy consumption and total energy consumption intensity dual control, strict new coal project access, new (modified, expanded) construction project coal consumption reduction of coal instead. By 2020, the city's total coal consumption by 2015, down from more than 5%. Continue to promote alternative energy coal and oil, replace reached the national requirements. No new 35 t steam / hour or less polluting fuels boilers. Strengthening coal quality control, promote clean coal utilization. Before the end of 2020, clean coal utilization rate of 92%, the proportion of electricity than to accept deliveries in 2017 significantly increased.
3, to carry out comprehensive improvement of coal-fired boilers. Increase efforts to eliminate small coal-fired boilers, the urban built-up area basically eliminated tea furnace, operating a stove, grain storage and drying equipment, coal-fired facilities; basically out of 10 steam tons / hour and 35 steam tons / hour coal-fired boilers. 35 t steam / hour and more polluting fuels boilers completed ultra-low emissions and energy transformation. Low nitrogen gas boiler basically completed the transformation. Strict control of the new urban area of biomass boilers. Biomass boilers should be dedicated boiler, blended prohibit other fuels such as coal, and other supporting efficient dust bag embodiment, non-coal, oil, natural gas-fired boilers and the like directly Burning biomass briquettes.
4, the positive development of central heating. Cogeneration units to increase the technological transformation efforts, speed up the heating pipe network construction, improve the heating capacity and the full release before the end of 2020, phasing out the cogeneration district heating pipe network coverage and high pollution coal-fired boilers in the range. In the area where no cogeneration district heating conditions, a plurality of existing small coal-fired boilers, an alternative construction of large-capacity coal-fired boiler in accordance with the principles of the reduction or the equivalent.
5, deepening the construction of high-pollution fuel combustion zone ban. According to "adjust Yiwu prohibit the use of polluting fuels sales area plan" (Yi Zheng Ban Fa [2018] No. 180) documentation requirements, a comprehensive investigation and eliminate high-polluting fuel facilities within the city, to ensure that no dead ends, no blind spots, Finish high pollution fuel combustion zone ban burning building before July 2019.
6, improve energy efficiency. Vigorously develop, promote energy efficient technologies and products to achieve key energy industries, energy-saving equipment standard full coverage. New energy-intensive projects per unit of product (output) energy consumption should reach the international advanced level. Local conditions to improve building energy efficiency standards, and increase efforts to promote green building, city guide implementation of green building standards for new buildings. Renovation of existing residential buildings to promote energy conservation, encourage rural energy-saving housing.
Hot water boiler in question do not know what professional? In home use thermostat hot water boiler factory, which is related questions? For example, pressure hot water boiler, water level gauge whether they need? And hot water boiler pressure equalization tube, what role? In addition, there are some other issues. So below, in the form of questions and answers will be used to initiate and conduct specific, so that we can have a comprehensive knowledge and understanding through. 1. The tonnage of hot water boiler is 1 ton, if you want the temperature rises from 75 degrees to 90 degrees, this 1-hour traffic is how much? Want to answer this question, we need to know is that the standard of one ton of hot water boiler, the flow is 24 m3 / hour. If, for the boiler return water temperature is 15 degrees, then in theory, the boiler operating at full capacity, the cycle of water which can reach 40 m3 / hr. However, influenced by a number of factors, which numerically is somewhat reduced. Therefore, it is 1 hour flow of 25 cubic meters.
It must be noted: When someone is working inside the drum, the drum must have someone outside monitoring.
2, before entering the combustion chamber or flue work must be taken ventilation, anti-virus, fire, explosion-proof measures. And the total flue chimney flue or other operation of the boiler is connected to the gates are closed tightly.