industrial hot water boiler system
We learned that recently, Beijing issued a "three-year action plan to win the Beijing Blue Sky Wars," to date, mainly to strengthen ecological environment construction, pollution control tough fight to win Beijing, make the appropriate efforts. Details are as follows.
First, build a green energy system
Combined with the characteristics of the capital, in the city to protect the power supply, heat supply network under the premise of safe operation, relying on intelligent technology, strengthen external power transferred, increase the proportion of outside transmission. Full development of new local energy resources. Promoting clean renewable energy for heating, Municipal Development and Reform Commission, City Management Committee and other sector organizations to increase renewable energy use in key areas clean city sub-center, Beijing's new airport and other heating. In principle, to new natural gas cogeneration and gas chemical projects.
Second, lay Yajian coal finale
Led by the Agriculture Commission, in accordance with the principle of progressive advance of the first plains, mountains and then to "coal to electricity," the main scientific technical route choice, according to local conditions to promote rural village "coal to clean energy" work. 2018, the completion of the plains 450 villages "coal to clean energy" to carry out energy-saving synchronous rural residence. Completion of Pinggu District, clean energy transformation of coal-fired central heating boilers 5 of Yanqing district, the basic realization of the city's Plains "No Coal." In 2019, the development of scientific and effective mountains "coal to clean energy" technology roadmap, the heating period to break a long, large temperature difference and other problems, an orderly mountain villages of "coal to clean energy" work.
Third, improve energy efficiency
Municipal Development and Reform Commission and other departments to study and improve energy consumption limits system. City Housing and Urban Construction Commission, the Municipal Planning and Land Committee and other departments to revise new residential building energy efficiency design standards, energy-saving rate of more than 80%; accelerate the development of ultra-low energy buildings, new buildings strict implementation of green building standards. City Housing and Urban Construction Commission, the Municipal Urban Management Commission, Agriculture Commission and other departments saving renovations to existing buildings, Rural public buildings energy-saving standards and scope of the earthquake.
Fourth, accelerate infrastructure construction clean energy
City Management Committee, the Agriculture Commission and other departments to speed up the "coal to electricity" grid upgrading in rural areas, to meet the heating needs of the field of alternative energy. Into the "No Coal" facilities construction village, power and other reconstruction within the scope of planning in advance to give priority to implementation. Related power companies continue to strengthen the construction of power facilities and support capabilities.
We should take some effective measures to increase the use of gas industrial hot water boiler system of each machine in the course of people's need to take care of, otherwise there will be some unnecessary trouble. So, for professional gas hot water boiler, how to take effective way of protecting it? In normal use, always pay attention not only to the effect of gas hot water boiler should also take effective measures to increase its use. life. 1. maintain this pressure curing method is suitable for closed more than a week but does not fix the boiler. You can first of all the water drained pot, then scale furnace cleaning and re-add qualified demineralized water. Regular use of fire to warm water temperatures in summer gas hot water boiler is kept at 10 degrees. So, it can not be frozen in winter; water boiler should also periodically, to maintain the pressure in the boiler reaches the normal value, to prevent air from entering the drum. 2. Maintenance wet method is suitable for such maintenance has been closed less than a month's gas hot water boiler. After the shutdown, the water leaving the boiler a predetermined time, the internal cleaning impurities; second, all inlets and valve should be closed, completely separate from the operation of the boiler; and a special preparation of mercury. The basic solution was placed in a boiler protection; micro-wave oven should be used regularly in order to maintain the heated drying surface during the entire maintenance. 3. Maintenance dried dry for long maintenance downtime gas hot water boiler. Need to drain water and to remove impurities, followed by the complete separation of operation in the boiler; a suitable amount of moisture absorbed by the desiccant in the boiler, and require direct contact with a heated surface not desiccant boiler. Within a month, you should check whether the desiccant in the boiler and no corrosion. The method of the above three aspects is cured gas hot water boiler. When using the boiler, regular inspection, pay special attention to corrosion of steel. If long ignored corrosion problems, it will have unpredictable consequences. Therefore, maintaining high stability is essential for the gas hot water boiler.
Use steam boiler steam boiler explanation Di high efficiency, strong firepower, Di is a common production equipment, but also has some of its own Di dangerous if used improperly, it will cause unnecessary trouble. So familiar with the instructions for use steam boiler is necessary Di. So then, the editors based on years of experience, will use the specifications are summarized below. When the company receives a steam boiler, boiler Di for normal use, as well as business operators Di their own safety, we must strictly abide by the "Production Safety Law," "Boiler and Pressure Vessel Safety Supervision Provisional Regulations" "Steam Boiler Safety Technology Supervision" about provisions. This applies to a fixed pressure steam boiler water as a medium, comprising a coal-fired steam boiler, a steam boiler fuel, gas steam boiler. Use of the boiler plant Di technology should have the appropriate certificate, have both technical documentation and construction quality boiler installation supporting information. Enterprises must attach great importance to the boiler safety. Appoint a full-time staff responsible for managing the boiler equipment, improve the management of the use of boilers in accordance with code requirements. Formulate ensure the safe operation of the boiler structure according to the type of boiler, combustion and explosion-proof requirements and procedures, fire prevention, anti-virus and other security management system and the accident approach, in accordance with its strict implementation. Do not drink alcohol and posts and off-site. Boiler should be regularly repair and maintenance, the unit can not be forced to use any security risk boiler. Should be repaired before construction drawings and technical solutions. Repair of technical expertise required reference standards and relevant technical regulations boiler. After completion of repairs, should the pattern, material quality certificate, a certificate of quality inspection and repair and other technical information is stored in the technical archives plant boilers. Non-boiler room operator banned from entering the workplace. Foreign workers must be allowed to enter or be accompanied by the relevant approval of the leadership.
stop the boiler to dry it :
2 hours before the boiler stoped,with the help of water supplying system and medicament system, the fireman add ammonia to the boiler to increase the PH value and ammonia concentration. In this way, a protection membrane will be formed in the boiler with which the corrosion caused by the boiler water will reduce during the idle time.