kitchen bathroom use instant hot water boiler boiler
Foshan Gaoming Liu Ling Textile Dyeing and Finishing Co., Ltd. was founded in 2007, enterprises comprehensive strength, advanced processing equipment, detection means perfect, has a complete quality assurance system, the introduction into a large number of advanced production equipment, to ensure that technical standards and products stable to improve the quality of laid a solid foundation, enjoy a high reputation in the industry. Liu Ling Gao textile company twice with my company were to buy a 20 tons of steam and a whole 10 tons of steam condensing steam boiler fuel gas for the production of textile dyeing and finishing company. Fang fast with strong comprehensive strength and improve the service system to win the favor of the other side, communication from the initial to the final boiler factory-installed square fast all uphold the customer's perspective to think and observe the service concept, for the sake of clever Liu Ling textile companies according to the company's actual demand for textiles, the development of specific programs.
Hot water boiler safety hazards in the production and use: boiler body, although not affected by ring pump pressure, but the boiler has been affected by high hydrostatic pressure of the hot water storage tank provided. Gas kitchen bathroom use instant hot water boiler boiler with environmental protection, energy conservation, safety, salient features fully automatic operation, and ease of use. In addition, due to the operation of the economy, government policies to encourage, gas hot water boiler more and more people of all ages. The higher the floor, the higher the static pressure of the hot water. The diameter of the exhaust pipe main body is mounted on the boiler pressure hot water is too small, a diameter of only some of the exhaust pipe ≤20mm. Steam generated in the furnace can not be quickly discharged, so that the furnace body to withstand a certain pressure, there are certain risks. In the detection process found that when the pressure hot water boiler rated power of 30 million cards, ≤20mm furnace exhaust pipe, due to insufficient capacity of the exhaust steam, the steam pressure generated in the furnace up to 0.15Mpa.
How sewage boiler plant (1) opened the internal valve of sewage; (2) outside the valve opened slowly discharge of sewage, pipes for warm and sewage; (3) a plurality of times on and off from the outside sewage valves, slowly flushing liquid inside the furnace dirt, the dirt can be discharged liquid; (4) closing the internal valve of sewage, the sewage between the two store water discharged from the valve; (5) off the outer discharge of sewage valve, complete sewage.
Second, the low investment costs
If you want to reach a lot of coal-fired boiler in the use of environmental standards, need to configure ancillary equipment soot blowers, dust, slag removal equipment, fuel drying, etc., this is not a small investment costs.