olive shell pellet hot water boiler
In March 2010, ZG awarded a contract to build what is described as the world's largest 100 per cent biomass fired CFB boiler. The 190 MWe CFB unit will be installed adjacent to the existing units at the power station.
6 tons of gas steam boiler start / ignition / boost a description, unit 1 starts, the boiler starts to open the first draft fan. 2, the induced draft fan starts normally from about 1 to 3 minutes blower opening. 3, starting Cleaner. 4, rotation of the grate, and adjusted appropriately stalls second ignition 1, ignition starts after all the examination was normal, the amount of wind and the wind blowing good after normal combustion seam to be adjusted to maintain a certain furnace pressure (-15 ~ -30Pa ). 2, when the temperature is increased Stokes is not too fast, the time from ignition to supply the steam required for less than 2 hours. 3, when the air vent has steam coming off when air vent. Third, the booster 1, when the boiler is boosted to 0.1 ~ 0.2MPa, to the flushing water pressure gauges trap. 2, when the boiler is boosted to 0.2 ~ 0.3MPa, to check every one hole, hand holes, valves and other leaks, if the screws are loose (if the screws are loose, the screw must be tightened). 3 when the boiler is pressurized to 0.3 to 0.4MPa, sewage drain valve open time of the drum, reducing the temperature difference between the upper and lower drum to promote water circulation. 4, when the drum steam pressure gradually increased, the components of the boiler to be noted that there are no special or abnormal sound occurs, if the above anomalies, should immediately check, shutdown can check, if necessary, until the fault is cleared before continuing 6 run. 5, during boiler Stokes, economizer outlet water temperature must be monitored to prevent moisture inside of the economizer, economizer valve leading to the drum can be closed if necessary, open the economizer recirculation valve leading to the tank, of water economizer alone, but before the steam supply to return to normal position, to prevent water shortages.
Gas boiler equipment must do what some of the environmental compliance process coal-fired boilers must do desulfurization and denitrification, gas boiler equipment? There is no done deal as long as the soft water? Gas boiler equipment belongs to clean energy, the chimney does not require any treatment. Processing involves water, do not understand what you say is which side? Gas boiler feedwater equipment must pass soft water, to avoid the formation of scale gas-fired boiler equipment. If the sewage discharge, simply lowering the temperature, precipitation was just fine direct emissions. Therefore, the gas boiler equipment need not comply with the requirements of environmental protection measures.
President of the association leaders to introduce this year is an important period of the 20th anniversary of the group. After 20 years of development, the Group to "create convenient boiler boutique users" for the mission, adhere to scientific and technological innovation, all-round, multi-channel strengthen technological innovation, we have launched a variety of users for the use of energy-saving, low new nitrogen, gas boiler to become the industry leader. Luhai Gang Jiao Ling Wang, president, accompanied by the Secretary-General and his party visited the Group's newly completed R & D base, clean fuel test center, exhibition hall and a multimedia remote monitoring center.