open system gas fired hot water heating boiler
What are the indicators of factors affecting the efficiency of the steam open system fired hot water heating boiler Shandong? State basically in full swing during the move from coal to natural gas, hot water boiler with greatly minus the fine dust contamination, together with nitrogen oxides and other harmful gas emissions have been manipulated. Power is an important goal of measuring target hot water boiler, give you a look behind the cause of a direct impact on several hot water boiler power targets. By examining the relevant departments, and hot water boilers consume more important from these two local: the burning air-fuel ratio unqualified and heat loss. Possible to decrease heat loss can be recycled at the end of the formation of the latent heat of flue gas hot water boiler assembly, or with more kinds of class condensing boiler. Burning fuel ratio unqualified inappropriate Summary: General hot water boiler according ejector incinerator machine, causing air-fuel ratio can not be flexibly adjusted. 70% of the hot water boiler is a mechanical blower according burning machine, leading to substandard fuel ratio has the following several reasons: the more important fuel ratio failure probability can be divided into two types: When oxygen is overrun, there will not be excessive cold air is heat, hot water boiler power lead to the use of improved hot water boiler output target weakened; when oxygen is non-compliant, there will be insufficient burning phenomenon, showing a hot water boiler output target weakened. Shandong gas boiler steam boiler talked about how sewage? (1) inside open blowdown valve; (2) gradually open the blowdown valve external to warm up and sewage pipes; (3) an external switch repeatedly discharge water valve, slow flush pan scale , so that as the scale is discharged; (4) locking the inner blowdown valve, between these two discharge water storage water drain valve; (5) locking the outer blowdown valve, sewage terminated. When the people usually use gas steam boiler, power outage situation is obviously occurs when there is, admittedly now very small probability of occurrence of a power outage, What, then the people can not ignore this kind of situation may occur. The author taught the people, process knowledge this type of situation from occurring. First, after the power outage, the total mass to quickly lock steam boiler gas valve, this kind of boiler is to avoid the effect of leaking. Second, the next step is to lock the main switch valve with various natural gas steam boiler circuit. Third, locking gas steam boiler slag coherent various water discharge valve block, otherwise will probably cause additional problems of a coherent gas steam boiler. Fourth, to lock the various air intake valve deaerator. Fifth, the above outline done, in accordance with the order of daily occurrence to stop using the shutdown to manipulate, and verify that the volume of water in the furnace, gas and other energy corresponding to the description. Power outages may now be able to basically be able to say that very little gas steam generating boiler work, What, then public still can not completely avoid this kind of situation, which also requires manipulation of the masses of standard rules of this kind of situation occurred after carefully , as if such a situation occurs, etc. without question.
How to handle exceptions gas open system fired hot water heating boiler? If the gas-fired boiler circulating pump only exception occurs, such as the current decreases, the pump outlet pressure returns to zero, indicating that the pump is idle, no oil, this may be due to the evaporation caused by the oil. Therefore, first, to find out the reason Young vaporized and take measures, such as filter clogging empty the circulating pump, the bypass should be opened immediately clean the filter; if the system does not exclude gas liquid water due to the new thermal caused or decomposition of water, air valve should open immediately. Circulation pump pressure constant, the current increases, flow decreases, metamorphism thermally conductive liquid, the viscosity increased, should be replaced or regenerated. Hot water boiler boiler assembly PC-style controller, all functions are stored on a smart chip, intelligent boiler, digitization, automation, humane, intelligent control of boiler water temperature, water temperature reached the heating automatically stop; large screen fonts display temperature, boiler water temperature at a glance. If the new heating electrically conductive liquid comprising water or system does not exclude the decomposition gas, the air valve should be opened immediately in the exhaust gas. When the current is below the normal circulating pump, a circulation pump showed reduced efficiency, decreased flow rate, which may be due to the fouling and clogging of pipes caused by the heating, to deal with stainless steel chain cleaning. If the differential pressure across the filter in the gas boiler is increased, the pump inlet pressure drops, the filter may become clogged, the bypass should be opened in order to dismantle and clean the filter.
Our emphasis on increasing green, local governments also open system fired hot water heating boiler operation produces nitrogen oxides and smoke emission requirements become more stringent. Fast boiler followed by the national trend of development, deepening of cleaning boiler product design and development. Lulu as a representative of business development of the national beverage, and hope to find a set of boiler energy conservation and clean in one, for drink production process of fermentation, sterilization, drying, curing and other processes. After many visits and market research, in October 2017 and entered into boiler fast boiler purchase contracts, purchase two 10 tons of steam and a whole 20 tons of steam condensing steam boiler. The two sides this cooperation is the other quality fast condensing gas boiler highly recognized, has proved a powerful strength fast boiler in the boiler production and service of gas condensate from the side.
The preparation you need to do before the open system fired hot water heating boiler is installed
The boiler is a device that supplies steam and hot water for industrial production or daily life. After the company purchases the boiler model, it needs to consider the installation problem. The installation of the boiler is directly related to the important steps of the smooth operation of the boiler, except for the installation of the auxiliary machine. Also need to pay attention to the preparation before installation.
1. Handling the registration of natural gas boiler installation: According to the “Safety Supervision Regulations for Steam Boilers”, the units that use the boilers should go through the registration procedures one by one. The boiler use unit shall have a person responsible for the boiler installation work, responsible for contacting the local boiler supervision agency and filling out the installation notice. When the boiler is installed, it must be attended by a furnace, and it is equipped with a pipeman, a fitter, a hoist, a cold workman, an electric welder and an auxiliary worker.
2. Determine the installation location and qualification of the boiler to determine the installation location. The boiler installation unit must have a boiler installation qualification certificate issued by the superior authority in accordance with the installation scope.
3. Inspection of boilers and accessories: Before the installation of natural gas boilers, the boiler body, combustion equipment, components, natural gas boiler auxiliary machines and accessories shall be inspected and accepted according to the drawings, and records shall be made. If it is found that the relevant standards are not met, it shall be promptly submitted to the factory. .