panki thermal power plant boiler details in brief
8, after the panki thermal power plant boiler details in brief by boiling out, shall comply with the requirements of the series:
(1) no grease drum inner wall;
Boiler replacement is inevitable, but many plants are still a lot of steam panki thermal power plant boiler details in briefs. In order to make some of the boiler continue to play a "heat" effect, will be transformed into a steam boiler hot water boiler is a good choice. Steam boiler into hot water boiler, not only conducive to energy saving and low consumption of coal is also conducive to a low-carbon economy.
To reduce the total coal consumption, reduce air pollutant emissions, Guigang Municipal People's Government announced the latest "2019 Guigang tackling air pollution control plan" proposed scheme: Guigang City is actively taking measures to reduce coal comprehensive use of renewable energy , natural gas, electricity and other energy alternatives to coal consumption, reduce the proportion of coal consumption, focusing on reducing the total non-electric coal consumption. New coal projects to implement alternative coal reduction, the implementation of inventory management, so that statistics can be verified.
Details are as follows.
First, the implementation of the total coal consumption control. Take measures to reduce overall coal, renewable energy, natural gas, electricity and other energy alternatives to coal consumption, reduce the proportion of coal consumption, focusing on reducing the total non-electric coal consumption. New coal projects to implement alternative coal reduction, the implementation of inventory management, so that statistics can be verified. October 2018 in conjunction with the regional government Council issued the "Guangxi county industrial park planning and adjustment plan" and other industrial park planning and implementation of the adjustment, the promotion of industrial parks to carry out "an area a heat source" upgrade, encourage 300,000 kilowatts or more coal-fired heating unit carried out the transformation in cogeneration planning guidance to promote the backward small coal-fired and coal-fired thermoelectric heat within the range of (biomass) integrated boiler shut down.
Second, accelerate the comprehensive improvement of backward small boilers. According to the State Administration of Work Market and three ministries "on the strengthening of energy-saving environmental protection boiler" (National City Supervisor ad hoc [2018] No. 227) requirements to promote energy efficient boiler environmental protection, energy-saving environmental protection to promote the transformation of boilers, eliminate backward boiler. Coal-fired boilers built-up area to carry out an intensive investigation, the investigation out of the coal-fired boilers to register one by one, to establish accounting and inventory management, according to local conditions, Take Measures to develop small boiler (10 tons of steam per hour and below) Integrated remediation plan, the classification proposed remediation requirements, before the end of May 2019, the Municipal environmental Protection Bureau for the record. Carry out a comprehensive district built 10 tons of steam per hour and small coal-fired boilers out of work, according to the law to increase efforts to eliminate small coal-fired boilers in accordance with regulations, in 2019 the completion of small coal-fired boilers out of the task; all kinds of more than 10 tons of steam coal boiler strengthen environmental law enforcement supervision, strict implementation of emission standards for boilers that can not be stable discharge standards, shall order rectification according to law, after rectification still do not meet the requirements, shall not continue to use; to strengthen environmental law enforcement supervision of biomass boilers, in particular to strengthen regulatory biomass boiler ban on high-pollution fuel combustion zone of the city; biomass boilers boiler should be dedicated, efficient dust bags and other supporting facilities, prohibit blended with other fuels such as coal. The city and county-level cities above the built-up area in principle, to create a new 35 tons of steam per hour of coal-fired boilers and other regions in principle no longer new 10 tons of steam per hour and below the coal-fired boilers.
Condensing hot water panki thermal power plant boiler details in brief room What are the requirements for electrical engineering condensing hot water boiler room electrical professional requirements: (1) condensing hot water boiler room should be set explosion-proof, waterproof lamps. It requires sufficient illuminance in the boiler water between the condensing operation. Pressure gauge readings particularly important should gauge and other specialty lighting set, to avoid operator error: (2) condensing at coal-fired hot water boiler and ancillary equipment has just started, often due to various factors which cause the motor apparatus starting current exceeds the normal range, the device can not start or cause air switch [burned). So, with the operating personnel should take measures to reduce the starting current of the motor, the normal operation of equipment. (3) In order to accommodate automation of the control of the fuel gas condensing boiler water, boiler water condensate should each equipped with the appropriate control cabinet. [Coal-fired boiler control cabinet or disk) should be provided to monitor the position of the operator within the scope of the, condensation can always observe the movement of the hot water boiler and associated equipment. (4) for conveying gas, liquefied petroleum gas fuel line (of metal tubing) should be set static grounding means when the condensing boiler house electrical system ground with lightning protection network and can be connected thereto, or should be provided static grounding system. (5) condensing the gas vent pipe for hot water boiler, which should be installed on top lightning. (6) Where the control and monitoring of the condensing boiler water level, pressure, gas leakage alarm, etc. haggard meter device shall ensure sensitivity, and to ensure the quality of agricultural instruments necessary testing and checking devices. (7) respond to electrical materials (including power, lighting, automation instrumentation systems) in construction strictly. In order to ensure safe and reliable operation, especially for gas condensing hot water boiler room, often professional electrical short circuit or other accidents can have serious consequences.